Transform your available land into a source of energy production and sustainably reduce your reliance on the grid. Powesco designs, finances, and deploys photovoltaic installations tailored to your energy performance and decarbonization goals. 

  • -41% electricity bill
  • ROI 6–10 years
  • ESCO financing available

Request a photovoltaic quote

An expert will call you back within 48 hours — no obligation

  • Response within 48 business hours
  • No commitment
  • Confidential data

By submitting this form, you agree to our privacy policy.

⚠ Local energy production is becoming a strategic lever. Faced with rising electricity costs and decarbonization objectives, photovoltaics offer a sustainable way to reduce dependence on the grid while maximizing the value of available space in your real estate portfolio. 

WHAT IS THIS

Produceyour own energy and secure your costs in the long term 

In practice

  • Savings

    -41% on the electricity bill in self-consumption (observed result).

  • KING

    6 to 10 years for a well-sized installation with subsidies.

  • Funding

    ESCO funding, ADEME aid, CEE and regional schemes can be mobilized depending on your project.

  • Guarantee

    Manufacturer's warranty and performance monitoring throughout the entire operating period.

Photovoltaics is now one of the most effective levers for sustainably reducing the energy costs of a building while accelerating its decarbonization trajectory. 

However, the profitability of a project depends on many parameters: consumption profile, available surface area, connection capacity, self-consumption or resale strategy. 

Powesco takes charge of the entire project, from the feasibility study to production monitoring, with a performance-oriented and return-on-investment approach.

  • Feasibility study and complete site analysis
  • Multi-scenario sizing and financial simulation (20 years)
  • Handling administrative procedures (permits, connections)
  • Turnkey installation and connection
  • Real-time production monitoring via SEME NEXTEP

What the photovoltaic installation brings

  • –41%

    electricity bill for self-consumption

  • 6–10 years

    return on investment

  • 20 years

    linear production guarantee

  • 0€

    initial investment possible

What you get

A turnkey photovoltaic project in 5 steps 

From initial analysis to post-installation monitoring — Powesco manages everything.

  • Feasibility study and financial simulation over 20 years

    Site analysis (roof, shading, connection), hourly consumption profile, multi-scenario simulation (self-consumption, sale, storage). IRR, payback time, available subsidies.

  • Complete administrative file

    Prior declaration or building permit as applicable, ENEDIS connection request, OA purchase contract request if applicable. Powesco processes all applications — you approve.

  • Certified installation and connection

    Installation of panels, inverters, and protective equipment. Connection to the internal and public grid. Electrical compliance testing (Consuel). Qualipv certification or equivalent.

  • Optimized financing plan

    Identification and structuring of available aid: ADEME, CEE via Axioris, regional aid, EDF OA purchase obligation. Comprehensive financing plan integrating all sources.

  • Production monitoring and annual report

    Connect to SEME NEXTEP for real-time production monitoring. Dashboard accessible from your interface. Annual performance report with target/actual comparison.

Ahmed BOUCHRIHA

Ahmed Bouchriha

Head of Solar Design Office at Powesco

THE EXPERT'S WORD

The profitability of a solar project is determined before installation 

The performance of a photovoltaic system depends primarily on its sizing. A thorough study allows for optimizing self-consumption, anticipating grid connection constraints, and ensuring the long-term profitability of the project.

Frequently Asked Questions

Do you have an energy efficiency project, questions about financing or regulatory obligations? Our experts are here to help.

Speak to an expert

It depends on the power output and the location. For installations ≤3 kWp, a prior declaration is generally sufficient. Above that size, it depends on the type of building and local planning regulations. Powesco handles all the necessary paperwork.