5-year ESCO contract for the hotel industry, building management systems (BMS) and relamping.

Mercure Courbevoie — La Défense Hotel

Achieve quick savings through targeted actions

Accor Hotels

Mercure Courbevoie — La Défense Hotel
-21 %
energy savings / year
-29 %
carbon emissions

Context

The Mercure Hotel in Courbevoie (18,600 m², 11 floors) was looking for quick cost savings without using its own budget. The two levers chosen—BMS optimization and complete relamping—are those that offer the best return on investment in the hotel industry.

The first results were visible within the first few weeks. No disruption for the teams, no impact on the customer experience — and a structural reduction in operating costs.

Situation before · after

Initial situation
Consumption
Halogen/fluorescent lighting
Non-optimized GTB control
Results observed
Energy savings -21 %
LED lighting
GTB Control

Missions completed

Identify quick-return actions

Targeted audit of building management systems and lighting — selection of levers offering the best savings/investment ratio.

Relamp the entire lighting system

Complete LED replacement — immediate savings on the bill, improved light output.

Recalibrate the BMS regulations

Correction of parameter drifts, optimization of time slots and instructions.

Measuring and sustaining results

Monthly performance monitoring over 5 years — contractual guarantee of savings achieved.

The first results were visible very quickly. This is what we expected: a pragmatic approach, targeted actions, and immediate savings. All without disruption for our teams or our clients.

Your building deserves the same results

Schedule an appointment with a Powesco engineer. Initial consultation within 48 hours, with no obligation.

Let's build your energy project together

« * » indicates the required fields

Your organization

Your contact details

By submitting this form, you agree to our privacy policy .